ENTECO E9080 DR: SECANT PILES AT THE UDINE (ITALY) WORKSITE
ENTECO rigs are hard at work in Osoppo (Udine-Italy) to build a protective bulkhead along the Transalpine oil pipeline in the section that crosses the Tagliamento River: this ambitious project involves building around 1600 secant piles with a diameter of 800 mm at depths from 7 to 15 m (centre distance between the piles 60 cm).
Watch the E9080 DR at work in the VIDEO »
Read the press release »