Enteco News 2017 - N.2 - 03/03/2017

ENTECO E9080 DR: SECANT PILES AT THE UDINE (ITALY) WORKSITE

ENTECO rigs are hard at work in Osoppo (Udine-Italy) to build a protective bulkhead along the Transalpine oil pipeline in the section that crosses the Tagliamento River: this ambitious project involves building around 1600 secant piles with a diameter of 800 mm at depths from 7 to 15 m (centre distance between the piles 60 cm).

Watch the E9080 DR at work in the VIDEO »
Read the press release »

Enteco S.R.L.
Via Kennedy 16
30024 Musile di Piave (VE)
Tel: 0421 679977
Email: info@entecodrill.com